London travel news LIVE: Dartford Crossing tunnel closure sparks chaos as lorry fire closes M25 lanes

London travel news LIVE: Dartford Crossing tunnel closure sparks chaos as lorry fire closes M25 lanes

Dartford Crossing’s east tunnel to remain closed this morning as urgent repairs are needed to fix a defect
Congestion building on the A282 this morning

Drivers using the Dartford Crossing are facing huge tailbacks this morning after a defect was discovered during planned overnight works.

National Highways says urgent repairs are needed to fix the issue, meaning the east tunnel is shut until further notice.

A height restriction of 4.8 metres (15ft 9in) is also in place at the crossing, with drivers urged to plan ahead.

By 9.10am, the A2 was congested in both directions approaching Darenth Interchange, with eight miles of queues and delays of around an hour and a half.

Meanwhile, a lorry fire is causing long delays on the M25 in Surrey, with tailbacks between Junction 13, for Staines, and 12, for Chertsey.

Meanwhile, there are minor delays on the District, Metropolitan and Northern lines due to train cancellations and a points failure.

Lines have reopened between Three Bridges and London Gatwick following a points failure, but disruption is expected until 9am.

Follow our live blog for the latest travel updates

Live updates

Social media users report queues of up to three hours

National Highways told drivers to expect delays of 90 minutes leading up to the Darenth Interchange, before the Dartford Crossing.

But X users had posted that they were sitting in traffic for much longer.

One social media user said he had been in traffic for three hours already.

Another said they were stuck in Swanley for two hours.

'Severe' delays warning as traffic jams towards Dartford Crossing worsen

Drivers have been warned that delays of up to an hour and a half are expected leading up to the Crossing.

Previously, drivers were waiting around 61 minutes before they could use the West tunnel to cross The Thames.

But this has been bumped up to 90 minutes. There is eight miles of congestion.

Queues stretching back to Heathrow Airport

Due to a lorry fire this morning, queues on the M25 are stretching back to Junction 14, which connects drivers with Heathrow Airport.

Traffic by Junction 14 on the M25
Traffic by Junction 14

Lorry fire causes three lanes to close on M25

A lorry fire on the M25 has caused three lanes to close
A lorry fire on the M25 has caused three lanes to close

The chaos on the M25 has worsened after a lorry caught fire between J13 Staines-upon-Thames and J12 Chertsey.

Three lanes were closed to deal with the incident. But now, lanes two and three have just reopened. Lane one, of five, is closed for specialist recover which National Highways said is “en route”.

There are delays of over 45 minutes and five miles of queues.

Dartford Crossing's tunnels will also close over the next few days

National Highways have announced upcoming planned closures of the Crossing’s west and east tunnels for works.

From today until Thursday, November 26, the west tunnel will be closed overnight from 9am to 5:30am.

On Saturday, November 28, the west tunnel will also shut from 10pm till 5:30am.

Then on Sunday, the east tunnel will be shuttered from 10:30pm to 5:30am.

The works include:

  • Maintaining ventilation, electrical and drainage systems
  • Replacing expansion joints on the viaduct
  • Replacing the panels which form the tunnel linings
  • Carrying out maintenance to the QEII bridge pylons, cable stays and dampers

Train delays of 30 minutes to Gatwick Airport

Meanwhile in London, delayed trains and disruption on routes to Gatwick Airport are still expected until 10am.

A points failure between Three Bridges and Gatwick Airport caused lines to close this morning. While they have reopened now, delays of up to 30 minutes are still expected.

Services across the Southern, Thameslink, and Gatwick Express networks remain subject to delays and short-notice cancellations while the timetable recovers.

National Rail said: “If you are travelling to Gatwick Airport / Luton Airport Parkway, please allow at least an extra 20 minutes for your journey to ensure you make your flight connections.”

Dartford Crossing only way to cross the Thames east of London by road

Carrying over 50 million vehicles a year, the Dartford Crossing is designed to handle 135,000 vehicles a day, but the average is now 150,000 a day – with the busiest days seeing up to 180,000 vehicles using it.

The Dartford Crossing is currently the only way to cross the Thames east of London by road.

The Crossing links the counties of Essex and Kent via the QEII bridge for southbound traffic and two 1.4km-long tunnels for northbound journeys.

Drivers have been diverted through the West tunnel

Commuters hoping to still use the tunnel can still use the Dartford West Tunnel.

But this tunnel has a height restriction of 4.8m (15ft 9in).

Vehicles between 4.8m (15ft 9inch) and 5.0m (16ft 6inch) high will be diverted via M25 clockwise.

Pictures of the long queues approaching the Dartford Crossing

Northbound on the A282 approaching the Dartford Crossing as the crossing's East Bore tunnel closes for emergency repairs
Northbound on the A282 approaching the Dartford Crossing
Tailbacks around Junction 2 on the M25 as Dartford Crossing's tunnel closes to traffic
Tailbacks around Junction 2 on the M25

Delays of over an hour

The A2 approaching the Dartford Interchange is congested both ways.

There is currently five miles of queues, causing a delay of 61 minutes.

Original source London travel news LIVE: Dartford Crossing tunnel closure sparks chaos as lorry fire closes M25 lanes

Back to home